Apex Property Services installs, repairs, and replaces concrete driveways across NYC and Nassau County. Stamped concrete, standard grey, colored concrete, and exposed aggregate β all finished to last 30+ years. Free estimates. All boroughs served.
Concrete driveway installation Queens (180/mo) | Brooklyn (160/mo) | Long Island (200/mo). New driveway installation from sub-base preparation through finishing. Standard 4" slab with rebar reinforcement, proper slope for drainage.
Stamped concrete driveway NYC (120/mo). Custom patterns and colors β slate, cobblestone, brick, and wood plank designs. Transform your driveway into a design statement while maintaining concrete's durability.
Driveway replacement NYC (180/mo). Old asphalt or cracked concrete driveway replaced with a new concrete surface. Complete demolition, haul-away, and new installation. All permits included.
Colored concrete driveway Queens (70/mo). Integral color mixed throughout the concrete slab for consistent, long-lasting color that won't peel or flake like surface stains or coatings.
Driveway expansion joint repair NYC (60/mo). Failed expansion joints allow water infiltration that causes cracking. We remove old joint material, clean the joint, and apply appropriate polyurethane or epoxy sealant.
Concrete driveway Long Island NY (200/mo). Nassau County residential and commercial driveway installation. Same crew, same quality as our NYC work. Free estimates throughout Long Island.
Concrete driveway cost Queens NY (160/mo). Here are typical cost ranges. All estimates are free and no-obligation.
| Driveway Type | Typical Cost Range | Timeline |
|---|---|---|
| Standard grey concrete driveway (1-car) | $3,500 β $7,000 | 2β3 days |
| Standard grey concrete driveway (2-car) | $6,000 β $12,000 | 2β4 days |
| Stamped concrete driveway | $8,000 β $18,000 | 3β5 days |
| Colored concrete driveway | $5,000 β $14,000 | 2β4 days |
| Driveway replacement (demo + new) | $4,500 β $15,000 | 3β5 days |
Concrete driveways last 30β50 years vs 15β20 years for asphalt. While concrete costs more upfront, the longer lifespan and lower maintenance make it more economical over time. In NYC's climate, concrete handles temperature fluctuations well when properly installed with adequate expansion joints.
A standard 2-car concrete driveway takes 2β4 days from demolition through finishing. After the concrete is poured, you must wait 7 days before driving on it and 28 days before parking heavy vehicles.
In NYC, a permit from the Department of Buildings may be required for new driveways depending on curb cut requirements and location. Apex handles all permitting as part of our service.
Concrete driveway cost in Queens typically ranges from $3,500β$12,000 for a standard residential driveway depending on size, thickness, reinforcement, and finish. Stamped or colored concrete costs more. Contact Apex for a free, detailed estimate.
Free estimates. Queens, Brooklyn, Long Island, and all NYC boroughs.
(516) 515-1951Β© 2025 Apex Property Services | Concrete Contractor NYC | Licensed & Insured
(516) 515-1951 Β· apexconcretenyc.com